Bathroom Remodel – Part 4 – Demolition

 

I was going to try and put all of demolition into one post but for some reason, the posting feature went on the fritz for me. Oh well. I will just put it here in a new post then. These pics are all from January 2015.


IMG_4300
My FIL taking out all the old tile on the vanity. The tile was mortared to the plaster wall behind it.
IMG_4304
The vanity area after the plaster wall and tile was removed.
IMG_4306
The tile surround on the bathtub was also removed.
IMG_4307
The hole in the bathroom ceiling. We’re still not quite sure why there was a soffitt here. My son Ian hated this hole. He was scared to use the bathroom because of it. To be honest, I didn’t like it much either! The ceiling was like this for about two weeks.
IMG_4310
The new lighting! These helped our bathroom look so much brighter than it was. It kind of looked like a cave before!
IMG_4311
The new ceiling light
IMG_4317
The pendant lights were actually pretty tricky for my FIL to install. I think this was because he was starting from scratch with the housings and the wiring.

-Lynn

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s